Environmental & Social Due Diligence · Project detail
Transnafta, Serbia
Environmental and social due diligence for strategic oil-products storage capacity near Novi Sad, Serbia.

01 · The decision context
Due diligence for oil-products reserve infrastructure next to an existing depot.
The public Bulkai project record describes environmental and social due diligence connected to an EBRD loan to Transnafta. The project concerned two tanks providing 40,000 cubic metres of storage capacity for strategic oil-products reserves in an industrial area beside the company’s existing oil-storage depot near Novi Sad and the local oil refinery.
02 · Project frame
Four verified elements that define the storage project.
01
EBRD loan
Approx. EUR 5.7m
Published financing context
02
Storage
40,000 m³
Strategic oil-products reserves
03
Tanks
Two tanks
New capacity
04
Location
Novi Sad
Near existing depot and refinery
03 · Bulkai contribution
An E&S lens for strategic storage expansion in an existing industrial context.
01
Due diligence
Environmental and social due diligence linked to the documented EBRD loan context.
02
Reserve context
Strategic oil-products reserves retained as the stated purpose of the additional capacity.
03
Site context
New tanks described in relation to the existing depot and nearby refinery setting.
Field note
Storage expansion requires environmental and social context to be considered alongside the strategic role of the infrastructure.
TS
04 · Source boundary
A source-bound account of the published storage investment.
The original project description identifies the approximate EBRD loan, two tanks, 40,000 cubic metres of strategic storage capacity and the Novi Sad industrial setting. This case study does not infer construction timing, operating status, technical specifications or due-diligence outcomes beyond the public record.